top of page
DJI_0770 revised.jpg

Club

Logo

Carwash

Case Study: Creekwood Residence

The construction of Club Carwash was meticulously documented from the very first day on-site through to project completion. Each phase of the build was captured in detail, providing a visual narrative of the transformation from an empty lot to a fully operational facility. Progress photos highlight key milestones, including foundational work, framing, and the installation of essential structural elements.

A particular focus was placed on the skilled craftsmanship involved in laying Concrete Masonry Unit (CMU) blocks. Timelapses showcases the hands-on expertise of the crew and the careful, step-by-step process that brought the structure to life. This comprehensive photo record not only serves as a valuable asset for project management and stakeholder communication but also demonstrates the dedication and precision behind every stage of construction.

DJI_0776 revised.jpg

Construction Video

Construction Photography Gallery

Selected Work

Negativ Space Website Logo 7.11.25 9.png

Think Negativ.

www.negativspace.com     I     281.310.1669     I     8215 Bristol Diamond Dr, Rosharon, TX 77583

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube
  • TikTok

© 2024 by Negativ Space. Powered and secured by Wix

bottom of page